Our clients look to us in confidence to assure project management, engineering, and operations services. The multi-disciplinary technical expertise of our company encompasses tasks including pre-project structuring, specialized master planning, and post-operations follow-up.
WATER AND WASTEWATER INFRASTRUCTURE URBAN DEVELOPMENT AND TRANSPORT WASTE MANAGEMENT
Urban development and transports
- Roads in private and public domains
- Earthwork and development of runways and service roads
Waste management
- Waste treatment centers (”Centres d’Enfouissement Techniques” or technically engineered landfill, green waste composting plants)
- Household waste disposal services (waste transfer stations, selective waste collection for recycling purposes)
- Municipal and special waste incineration
Water and Wastewater Infrastructure
- Potable water distribution systems
- Water catchment systems, drainage galeries, and deep-well boring for potable water production
- Seawater desalination systems
- Ultrafiltration and reverse osmosis for potable water production
- Rainwater sanitation
- Waterway engineering and development
- Wastewater sanitation
- Centralized remote control and maintenance systems of water networks
Environment
- project environmental impact studies
Energy
- Thermal, hydroelectric, solar, and aeolian power plants
- Electricity transmission and distribution grids
- High voltage and very high voltage transformer stations
- Petroleum storage solutions
- Hydrocarbon transportation systems
- Telecommunications systems
- Public lighting and road traffic sign networks in public and private domains
QUALITY CERTIFICATIONS
The SPEED, ISO 9001 certified in 1999, is marked by a high-quality system (manually and procedurally) to support the completion of projects on par with client expectations and needs.
Starting January 2002, the SPEED implemented an environmental management system resulting in ISO 14001 certification by the LRQA in April 2002.
This system assures systematic environmental sensitivity (in terms of flora, fauna, and sound pollution) from the early stages of project development. This is based on a systematic environmental analysis tailored to each project.