NOS CLIENTS
Communauté de commune Hava’i CODIM (Communauté de commune des Marquises) Direction de l’Equipement Direction de l’Environnement (DIREN) Direction des Infrastructure de la Défense en Polynésie (DIDP) E.A.D. (ex. EGT) Ministère et direction de la santé Office Polynésien de l’Habitat (OPH) Port Autonome de Papeete (PAP) S.A.U Service de l’Energie et des Mines (SEM) SECOSUD Plus de 30 communes de Polynésie Française
Brasserie de Tahiti
Electricité De Tahiti (EDT)
Gaz de Tahiti (GDT)
McDonald’s
Marama Nui
PETROPOL
Polynésienne des Eaux (PDE)
SARL REVA ITI
SAS SOCIETE COMMERCIALE DE TAIARAPU
SEML TE ORA NO ANANAHI
SCI PAMATAI
Société Tahitienne Des Oléoducs (STDO)
SOMSTAT
TOTAL Polynésie
Transport d’Energie électrique en Polynésie (TEP)
PROJECT MANAGEMENT
The SPEED’s project management and conception portfolio boasts a multitude of references in diverse domains, including potable water treatment, waste and wastewater management, electricity distribution systems, and renewable energy consulting.
WATER
Wastewater collection networks
Collective wastewater management in the Zone 1 FED of the city of Papeete: Project management – Papeete – Client: SEML te ora no ananahi – Operation value: 2 MRD – 2017- 2019
Collective wastewater management in Haapiti (touristic zone, connecting 220 users): Project management – Moorea – HAAPITI – Operation value: 200 M – 2017 – en cours
Collective wastewater management in Zone 1 A of the city of Papeete: Project management – Papeete – Client: SEML te ora no ananahi – 2012-2016
Marine targeted wastewater outfalls in Zone 1 of the city of Papeete: Project management – Papeete – Client: SEML te ora no ananahi – 2014-2016
Wastewater treatment plants
Wastewater treatment plant for an abbatoir in Papara: Project management assistance – Papara – Client : Direction de l’Agriculture – Operation value : 231,5M – 2018 – en cours
Taaone wastewater treatment plant, including deconstruction of the existing plant, wastewater treatment device creation, and collection network installation – Client : Direction d’Infrastructure de la Défense de PAPEETE – Operation value : 300 M
OPH (Tepapa, RHI Mamao) wastewater treatment plant audit – Papeete – Client: OPH – Operation value : 13 M – 2017
Feasability study: abbatoir wastewater treatment plant – Papara – Client : Service du Développement Rural – Operation value : 231,5 M – 2016
Evolutive wastewater treatment plan 3 500 -7 000 – 14 000 m3/j: Project management – Papeete – Client : SEML TE ORA NO ANANAHI – Operation value : 1,5 MRD – 2014 – 2016
Renovation and redesign of the POVAI wastewater treatment plant: Project management – Bora Bora – Client : Commune de Bora Bora – Operation value : 131 M – 2014 – 2016
General Studies
NUKU HIVA wastewater treatment masterplan – Client : Commune de NUKU HIVA – Operation value : 18M – 2018 – in progress
TEVA I UTA wastewater treatment masterplan – Client: Commune of TEVA I UTA – Operation value: 13M – 2018 – in progress
UTUROA wastewater treatment masterplan – Client : Commune de UTUROA – Operation value : 21 M – in progress
Project management assistance for the PAPARA abbatoir wastewater treatment plant – Client : Commune de PAPARA –Operation value : 10 M – 2018 – in progress
Assistance à maîtrise d’ouvrage construction STEP abattoir PAPARA – Client : Commune de PAPARA – Montant de l’opération : 10 M – 2018 – in progress
Study for the establishment of a Public Service for Non Collective Wastewater Treatment (SPANC) on Bora Bora – Client : Commune de BORA BORA –Operation value : 5M – 2018
Study for the establishment of a SPANC on Rurutu – Client : Commune de RURUTU – Montant de l’opération : 2M – 2018
Project management assistance (Service provision for the exploitation of the collective wastewater treatment in Papeete) – Client : SEML TE ORA NO ANANAHI – Montant de l’opération : 6M – 2017
Preliminary study for an extension of the collective wastewater treatment network – Client : Commune de BORA BORA – Operation value : 1,5M – 2017
Masterplan development for the commune of TAPUTAPUATEA’s (SPC) drinking water supply
Development drilling masterplan for the village of PAREA – Client : Commune de Huahine) – Montant de l’opération : 250 MF – 2019
Pricing scheme consulting for the potable water distribution department of Papara – Client : EPIC VAIPU – Operation value : NC – 2019
Technical assistance concerning the TEPEPE borehole – Client : Commune de Huahine – Operation value : NC – 2019
Project management for the Paea potable water distribution network works (Phase 1 – Tranche 2 of short-term works as defined in the drinking water distribution master plan) – Client : Commune de Paea – Operation value : 250 MF – 2018
Groundwater resources research – Client : Commune de Moorea – Operation value: 30 MF
Hydrological monitoring and techno-economic analysis in the perspective of exploitation of the Pic vert river – Client : Polynésienne des Eaux – Operation value : NC – 2018
Water source reconaissance in the Maara sector – Client : Commune de Paea – Operation value : NC – 2018
Project management assistance for updating the water department services – Client : Commune de ARUE – Operation value : NC – 2018
Project management for main water line renovation on l’avenue Arii Paea Pomare – Client : Commune de Arue – Operation value : 80 MF – 2018
Project management for development drilling works in Vaitupa and Papehue – Client : Commune de Paea – Operation value : 140 MF – 2018
Project management for establishing Atihiva lotissement’s water supply via borehole – Client : OPH – Operation value : 30 MF – 2018
Potable water network modeling for the commune of Arue – Client : Commune de Arue – Operation value : NC – 2018
Feasability study for a drainage gallery in Atimaono – Papara – Client : SPC – Operation value : NC – 2018
Statistic data anlysis for the water department – Client : Epic VAIPU – Operation value : NC – 2018
Drinking water masterplan update for Bora Bora – Client : VAITEHI – Operation value : NC – 2018
Papara’s drinking water supply masterplan update – study on the drainage gallery in Temarua – Client : EPIC Vaipu – Operation value : NC – 2017
Potable water masterplan update for the commune of Faaa – Client : Commune de Faaa – Operation value : NC – 2017
Preliminary study for the potable water distribution network renovation on Taputapuatea – Client : Commune de Taputapuatea – Operation value : 210 MF – 2017
Potable water network diagnostic for the collège de Makemo – Client : Direction Générale de l’Education et des Enseignements – Operation value : NC – 2017
Project management for potable water distribution works (Phase 1 – Tranche 1 of short-term components of masterplan) for the commune of Paea – Client : Commune de Paea – Operation value : 250 MF
Project management for the establishment of the potable water program 2016-2017 Phase 1 – Commune of Taiarapu Est – Client : Commune de Taiarapu Est – Operation value : 220 MF
Preliminary study for potable water program 2016-2017 Phase 2 – Commune of Taiarapu Est – Client : Commune de Taiarapu Est – Operation value : NC – 2017
Project management for the short-term potable water program execution in Taiarapu Est, Phase 3 Potabilization – Client : Commune de Taiarapu Est – Operation value : 165 MF – 2017
Development drilling on the production site of the Brasserie de Tahiti – Client : Brasserie de Tahiti – Operation value : 50 MF – 2016
Pilot tests for drainage gallery reconnaissance in Tuauru – Client : Commune de Mahina – Operation value : NC – 2016
Drinking water supply masterplan update for Mahina – Client : Commune de Mahina – Operation value : NC – 2016
Preliminary studies for development drilling in Parea – Client : Commune de HUAHINE – Operation value : NC – 2016
Project management for potable water network renovation in Hauti – Client : Commune de RURUTU – Operation value : 100 MF – 2016
Project management for a study for new water resources in the commune of Paea : borehole, drainage gallery, pseudo galerie drainante – Client : Commune de Paea – Operation value : 60 MF – 2016
Project management for potable water network renewal in Pihaena, Moorea – Client: Commune de Moorea – Operation value : 240 MF – 2016
Project management of the establishment of the drainage gallery of Tuauru – Client : Commune de Mahina – Operation value : 400 MF – 2016
Pilot study on the freshwater lens potential for exploitation on Motu Tevairoa – Client : Commune de Bora Bora – Operation value : NC – 2016
Preliminary study for the establishment of a drainage gallery in Tuauru – Client : Commune de Mahina – Operation value : NC – 2016
Study on a search for new water resources on Moorea – Client : Commune de Moorea – Operation value : NC – 2016
Potable water masterplan update for the commune of Paea – Client : Commune de Paea – Operation value : NC – 2016
Borehole exploitatoin in Haavai on the island of Huahine – Client : Commune de HUAHINE – Montant de l’opération : NC – 2016
Masterplan update for potable water supply in the commune of Papara – Client : EPIC Vaipu – 2016
Drinking water network diagnostic study for the commune of Paea – Client : Commune de Paea – 2016
Potable water distribution pricing scheme revision – Client : Commune de ARUE – 2016
ENVIRONMENT
Project management for realizing two river engineering works on the Nahoata river (Tranche 2) – Client : Direction de l’Equipement – Provisional operation cost : * M FCP – 2020
Project management for realizing river engineering work on the Vaipoopoo river – Client : Direction de l’Equipement – Provisional operation cost : * M FCP – 2020
Project management for establishing a gravel trap reservoir on the Taharuu River – Client : Direction de l’Equipement – Provisional operation cost :150 M FCP – 2020
Project management for infill work for LVT (Complementary mission MC1, EP and MC6, PPRI) – Client : G2P – Provisional operation cost : sans objet – 2020
Project management for the development of the NYMPHEA river – Client : Direction de l’Equipement – Operation cost : 2 000 M FCP – 2019
Hydraulic study for establishing a culvert at the University – Client : Commune de PUNAAUIA – Operation cost : NC – 2019
Nahoata canal construction project management – Client : Direction de l’Equipement – Operation cost : 220 M FCP – 2019
Assistant project management for wastewater treatment of the North East neighborhood fo the Pointe Vénus – Client : Commune de MAHINA – Operation cost : 50 MFCP – 2019
Fautaua watershed masterplan development – Client : Direction de l’Environnement – Operation cost : NC – 2019
Flood zone cartography for Lots 2 and 3 (8 rivers on Tahiti) ) – Client : Service de l’Urbanisme – Operation cost : NC – 2019
2D hydraulic modeling and cartagraphy of flood zones for Tavararo bridge restoration – Client : Direction de l’Equipement – Operation cost : NC – 2019
Hydraulic study for the Vairua bridge restoration – Client : Direction de l’Equipement – Operation cost : NC – 2019
Hydraulic study for establishing outlets on the Tuaru River – Client : Direction de l’Equipement – Operation cost : NC – 2019
Stormwater network diagnostic on Avenue Destremeau – Client : Direction de l’Equipement – Operation cost : NC – 2018
Technical assistance on the Faarumai bridge restoration (3 waterfalls) – Client : Direction de l’Equipement – Operation cost : NC – 2018
Hydraulic study of the Vairaa bridge – Client : Direction de l’Equipement – Operation cost : NC – 2018
Maruapo bridge restoration – Client : DCE – Direction de l’Equipement – Operation cost : 150 MF – 2018
Riverbank development on the Nahoata river – Client : Direction de l’Equipement – Operation cost : 450 MF – 2018
Feasability study of wastewater management in the eastern zone of the Pointe Vénus – Client : Commune de Mahina – Operation cost : NC – 2018
“Plan d’action Rivière” Phase 2 : pilot study, hydraulic analysis, and GIS – Client : Direction de l’Environnement – Operation cost : NC – 2018 – present
Hydraulic impact study of the Farehotu housing development (Hitiaa o te ra) – Client: OPH – Operation cost : NC – 2018 – present
Terua river development (DUP) – Client : Direction de l’Equipement –Operation cost: NC – 2018
Hydraulic study for wastewater management on the Route de Pamatai – Client : Direction de l’Equipement – Operation cost : NC – 2017
Project management for establishing rockfill post-flood on the Nahoata River – Client : Direction de l’Equipement – Operation cost : 50 MFCP – 2017
Flood zone cartography of the Atuoana River on Hiva Oa – Client : Service de l’Urbanisme – Operation cost : NC – 2017
Wastewater management works at the Hiva Oa airport (assistant project management) – Client : Direction de l’Equipement – Operation cost : NC – 2017
Project management for establishing two outlets on the Tevairupe River (Pointe Vénus) – Client : Direction de l’Equipement – Operation cost : NC – 2017
Flood resorption at l’Ecole Apatea in Papara (feasability study with 1D modeling and assistant project management)e – Client : Commune de PAPARA – Operation cost : NC – 2017
Stormwater network diagnostic on the Route de Ceinture in downtown Papeete – Client : Direction de l’Equipement –Operation cost : NC – 2017
Vaitapu bridge restoration (PRO-DCE) – Client : Direction de l’Equipement – Operation cost: NC – 2017
Faarumai bridge restoration (PRO-DCE) – Client : Direction de l’Equipement – Operation cost : NC – 2017
Terua River development (preliminary study with 1D modeling) – Client : Direction de l’Equipement – Operation cost: NC – 2016
Stormwater management on the airport platform on Hiva Oa (assistant project management) – Client : Direction de l’Equipement – Operation cost : NC – 2016
Hydraulic study of the Hanapaaoa River (feasability study with 1D modeling) – Client : Direction de l’Equipement – Operation cost : NC – 2016
Hydraulic study of the Orofara River (feasability study with 1D modeling) – Client : Direction de l’Equipement – Operation cost : NC – 2016
2D modeling of the Taharuu River post-development – Client : Direction de l’Equipement – Operation cost: NC – 2016
Development of the Lagon Bleu C5 outlet – Client : Commune de PAPEETE – Operation cost : NC – 2016
Development of the Tevaifaara (preliminary study and 1D modeling) – Client : Direction de l’Equipement – 2016
Preliminary study and DUP for riverbank development on the Nahoata River with 1D modeling – Client : Direction de l’Equipement – Operation cost: NC – 2016
2D modeling of the Nahoata after riverbank development – Client : Direction de l’Equipement – Operation cost : NC – 2016
Hydraulic analysis of various stormwater management strategies for Mahana Beach – Client : Direction de l’Equipement – Operation cost: NC – 2016
Complementary study for Q10 recalibration of the Tavararo River – Client : Direction de l’Equipement – Operation cost : NC – 2016
Flood zone cartography and development proposal for Tipaerui, Piafau, Mateoro, and Vaihiria Rivers – Client : Direction de l’Equipement / SAU – Operation cost : NC – 2016
Feasability study for outlets on Tevairupe River – Client : Créocéan – Operation cost: NC – 2015
Stormwater management masterplan for Papara– Client : Direction de l’Equipement – Operation cost : NC – 2015
Hydraulic diagnostic and assessment of fine particle transportation on Outumaoro – Client : Direction de l’Equipement – Montant des travaux : NC – 2015
Dredging work on the Tevaifaara River (hydraulic analysis and proposals) – Client : Direction de l’Equipement – Montant des travaux : NC – 2015
Feasability study for the Horley culvert – Client : Direction de l’Equipement – Operation cost : NC – 2015
Stormwater management study consistency improvement for the establishment of a DUP for the Pointe Vénus – Client : Direction de l’Equipement – Operation cost : NC – 2015
Taharuu River outfall development (complementary DCE) – Client : Direction de l’Equipement – Operation cost : NC – 2015
DCE and supervision of the gravel traps works on the Mairie de Punaauia canal – Client : Direction de l’Equipement – Operation cost : 20 M FCP HT – 2015
Paui River development (1D modeling) – Client : Direction de l’Equipement – Operation cost: 418 M FCP HT – 2015
Hydraulic study and culvert design near the Horley property on RT1 – Client : Direction de l’Equipement – 2015
Authorization application dossier for exploiting a Category 2 and 3 Engineered Landfill on Hiva Oa (Project management)- Client: Commune d’HIVA OA – 2011
Authorization application dossier for exploiting a Category 2 and 3 Engineered Landfill on Ua Pou (Project management)- Client: Commune d’UA POU – 2010
Environmental diagnostic of DASRI incineration activity on the NIVEE site – Client: CHT de Mamao – 2010
Authorization application dossier for establishing a green waste composting station in Papara – Client: Tahiti Compost – 2010
Authorization application dossier for establishing emergency power generators at the power plant – Client: OPT – 2010
Project management and impact study for renovating the landfill in Punaruu – Client: Commune de Punaauia – Operation cost : 90 MF CP – 2019 – 2020
Project management for realizing an unloading dock in the Paihoro landfill – Client: FENUA MA – Montant de l’opération : 50 MFCP- 2019- 2020
Project management of the engineered landfill design on Ua Pou – Client : Commune de Ua Pou – conduct of operation Haut-commissariat de PF – DIP – Operation cost : 300 M FCP – 2016 – 2017
Engineered landfill extension on Bora Bora – Client : Commune de Bora Bora – Operation cost : 200 M FCP – 2016 – 2017
Waste management plan for the community of the commune of Hava’i – Client : Communauté de Communes HAVA’I – Operation cost : NC – 2016 -2017
Opportunity study for transitioning waste management services from communes to Fenua Ma (Phases A and B) – Client : FENUA MA – Operation cost : NC – 2016 – 2017
State of the processes of waste treatment, waste reclamation, and masterplan (Phases A and B) – Client : FENUA MA – Operation cost : NC – 2016 – 2017
Conception of a landfil network on Fenua Ma territory (Phases A, B, and C) – Client : FENUA MA – Operation cost : NC – 2015 – 2017
Assistant project management for the the contract handover interms of the category 2 and 3 engineered landfill on Bora Bora – Client : Commune de Bora Bora – Operation cost : 3 506 350 F CFP – 2015 -2017
Green waste composting hangar DCE establishment for Huahine – Client : Commune de Huahine – Operation cost : 50 M FCP – 2016
Feasibility study for the establishment of waste collection points on Punaauia – Client : Commune de Punaauia – Operation cost : NC – 2016
Assistant project management for creating a public service for green waste collection and treatment – Client : Commune de Moorea – Operation cost : 2 034 951 F CFP – 2016
Project management for waste management on Ua Huka and the intermunicipality (financial and legal study of SPIC “déchets”) – Client : Communauté des communes des iles marquises – conduite d’opération Haut-commissariat de PF – DIP – Operation cost : 1 041 766 F CFP – 2015 – 2016
Waste treatment and collection masterplan update for the commune of Faa’a – Client : Commune de Faa’a – Operation cost : NC – 2015
KENTEC procedure analysis – Client: Commune de Faa’a – Montant de l’opération : NC – 2015
Feasability study for creating an category 2 and 3 engineered landfill on Raiatea – Client : Communauté de Communes HAVA’I – Operation cost : 200 M FCP – 2015
Preliminary study project management for waste management on Ua Huka and intermunicipality – Client : Communauté des communes des iles marquises – conduite d’opération Haut-commissariat de PF – DIP – Operation cost : 300 M FCP – 2015
Feasability study for establishing a category 2 and 3 engineered landfill on the Vaitoetoe site – Client : Commune de Faa’a – 2015
Complementary study for establishing a pricing scheme for waste collection in the commune of Arue (provisional summaries, service regulation establishment, and non-domestic user convention development) – Client : Commune de Arue – Operation cost : 964 950 F CFP – 2015
ENERGY ET INDUSTRY
Oil storage depot creation at SPMU Motu Uta (assistant project management) – Client : SPMU – Tahiti – Montant des travaux : NC – 2019
Wastewater treatment station in Papeete (general contracting works, project management of a conception team) – Client : SEM Te Ora No Ananahi – Papeete- remblai de la Papeava – Operation cost : 1.5 milliards CFP – 2014-2016
AVGAS depot in the north zone of the Tahiti Faa’a airport (conception project management) – Client : PETROPOL – Faa’a – Operation cost : NC – 2013
Project management for the conception of the Mobil gas station in Taravao – Client : SERMODIS – Taravao – Operation cost : NC – 2012 – 2013
Marine gasoil distribution station on Motu Uta (project management) – Client : STDO – Tahiti – Operation cost: NC – 2010
Public lighting equipment renovation in downtown Papeete (project management) – Client : Commune de Papeete – Tahiti – Operation cost : NC – 2018 – en cours
Public lighting equipment renovation on the RDO and RDP (project management) – Client : Direction de l’Equipment – Tahiti – Operation cost : 380M – 2017 – 2018
General diagnostic of the public lighting in the city of Papeete (audit) – Client : Commune de Papeete – Operation cost : NC – 2017
Public lighting equipment renovation in the commune of Pirae (Phase 2, project management) – Client : Commune de Pirae – Pirae – Operation cost : 30M – 2014 – 2017
ELECTRICITY DISTRIBUTION
HV/LV network renovation on Uturoa, including an underground 20kV line (tranche 2, project management) – Client : Commune d’Uturoa – Raiatea – Operation cost : NC – 2017 – present
HV borehole extension in Taravao (project management) – Client : SECOSUD – Taravao – Operation cost : 15 M – 2017 – 2018
HV/LV network renovation in downtown Uturoa, including an underground 20kV line (project management) – Client : Commune d’Uturoa – Raiatea – Operation cost : 300 M – 2011 -2015
ELECTRICITY PRODUCTION
Photovoltaic production on the archive service building in Papeete (project management) – Client : Service des Energie – Montant de l’opération : NC – 2020
Photovoltaic production for the Technical Services department for the Commune of Arue (project management) ) – Client : Commune d’Arue – Montant de l’opération : NC – 2019-2020
Feasability study for implementing a photovoltaic power plant for the Commune of Uturoa – Client : Commune d’Uturoa – Raiatea – Operation cost : NC – 2019 – present
Photovoltaic production implementation at the Uturoa fire station (project management) – Client : Commune d’Uturoa – Raiatea – Operation cost : NC – 2019 – 2020
Photovoltaic production implementation at the Tahiti and Moorea fishing cooperative (project management) – Client : DRMM – Tahiti-Moorea – Operation cost: NC – 2018 – 2019
Hybrid plant with storage on Tatakoto (feasbility study and administrative files) – Client : Commune de Tatakoto – Tatakoto – Operation cost: NC – 2018 – 2019
Photovoltaic production implementation on the CFPA buildings (project management) – Client : CFPA – Tahiti-Raiatea – Operation cost : 28 MCFP – 2017 – 2018
Photovoltaic production implementation on the city hall buildings in Taiarapu Est (feasability study, project management) – Client : Commune de Taiarapu Est – Taiarapu Est – Operation cost : NC – 2016 – 2019
Hybrid plant with storage on Tahuata (feasability study, administrative dossiers) – Client : Commune de Tahuata – Tahuata – Operation cost: NC – 2017 – 2018
Photovoltaic production implementation on administrative buildings (project management) – Client : Service des Energies – Tahiti-Moorea – Operation cost : 81 MF – 2015 – 2017
ELECTRICITY TRANSPORTATION
Substations 90-30kV in Arue, Papenoo, and Faatautia (assistant project management) – Client : TEP – Tahiti – Operation cost : NC – 2019 – present
90kV electrical connection between Tipaerui and Arue (project management) – Client : TEP – Tahiti – Operation cost : 2018 – present
90kV aerial-subterranean electrical connection, Faatautia Valley (project management) – Client : TEP – Tahiti – Operation cost: NC – 2018 – en cours
90kV electrical connection between Papenoo and Faatautia (conception study) – Client : TEP – Hitiaa o te ra – Operation cost : 500 MF – 2015 – 2016
90kV electrical connection on Avenue Prince Hinoi between Tipaerui and Arue (project management) – Client : TEP – Papeete-Pirae – Operation cost : 145 MF – 2016
90kV network rerouting on the 3rd street in Outumaoro (project management) – Client : TEP – Punaauia – Operation cost : NC – 2015
Reinforcement of the 30kV connection between Papenoo Aval – Papenoo 1 (project management) – Client : TEP – Papenoo – Operation cost : NC – 2015
Feasability study on connecting the 90kV transportation network on the island of Tahiti – Client : TEP – Tahiti – Montant des travaux : NC – 2013 – 2015
Equipment inventory and management methods study for public service delegation of the electric distribution network on Rurutu – Client : Commune de Rurutu – Operation cost: NC – 2020
Equipment inventory and assistance in contracting electrical public service delegation for the commune of Tahaa – Client : Commune de Tahaa – Operation cost: NC – 2019
Assistance in supervising the public service delegation of the electric distribution of SECOSUD – Client : SECOSUD – Operation cost : NC – 2019
Management methods study for public service delegation of the electric distribution of the commune of Taputapuatea – Client : Commune de Taputapuatea – Raiatea – Operation cost : NC – 2018
Management methods study for public service delegation of the electric distribution of the commune of Tumaraa – Client : Commune de Tumaraa – Raiatea – Operation cost : NC – 2018
Management methods study for public service delegation of the electric distribution of the commune of Huahine – Client : Commune de Huahine – Huahine – Operation cost : NC – 2018
Management methods study for public service delevgation of the electric distribution of the commune of Tahaa – Client : Commune de Tahaa – Tahaa – Operation cost : NC – 2017 – 2018
Assistance in contracting electrical public service delegation for SECOSUD – Client : SECOSUD – Tahaa – Operation cost : NC – 2016
Energy audit for municipal administrative buildings – Client : Commune de Taputapuatea – Taputapuatea – Operation cost : NC – 2019 – 2020
Electrical instrument analysis for municipal buildings of the commune of Huahine – Client : Commune de Huahine – Huahine – Operation cost : NC – 2019 – 2020
Energy assessment (Conseil en orientation energétique, COE) for the commune of Bora Bora – Client : Commune de Bora Bora – Bora Bora – Montant des travaux : NC – 2017
Energy assessment (Conseil en orientation energétique, COE) for the commune of Tahuata – Client : Commune de Tahuata – Tahuata – Operation cost : NC – 2017
CONSULTING, PROJECT MANAGEMENT ASSISTANCE, MASTERPLAN DEVELOPMENT, AND PROSPECTIVE STUDIES
SPEED has completed a diverse missions assisting and consulting in the interest of improving the operations of public services in various sectors, including potable water management, wastewater treatment, and waste management. The analyses and assistance extends to the following areas:
- consultation,
- organization methods,
- budget estimates for managing equipment installations,
- service pricing scheme studies,
- comparative analyses of contracting types and methods,
- contract drafting,
- assistance in negotiating and awarding contracts.
PROJECT MANAGEMENT ASSISTANCE
Project management assistance for a project involving the transformation of local products on the island of Raiatea (institutional consulting on agricultural techniques, operation budgeting assistance) – Client : Communauté de commune HAVA’I – 2014
Project management assistance for the Mahana Beach development project on the island of Tahiti (finalize statement of requirements, assistance in determining the contracting procedure with a private investor) – Client : Tahiti Nui Aménagement et Développement (Etablissement public) – 2014
Project management assistance for the realization of boreholes in the site “terre déserte” – Client: Direction de l’Equipement – 2011
Project management assistance in contracting (leasing) for the potable water network on Pirae – Client : Commune de Pirae – 2013
Project management assistance in contracting (leasing) for collective wastewater treatment infrastructures (network, station) – Client : Commune de Bora-Bora – 2012
Waste management in HAO – Financial and legal study of SPIC “déchets” (from assisting with the financing application through establishing the project contract) – Client : Commune de HAO – Conduct of operation Haut-Commissariat de PF –DIPAC – 2011
Project management assistance in contracting (leasing) of industrial water infrastructure (network, station) on Bora Bora – Client : Commune de Bora-Bora – 2011
Project management assistane in contracting the DSP (public service delegation) for the green waste composting station on Bora Bora – Client : Commune de Bora Bora – 2011
Waste management on Hiva Oa (financial and legal study of SPIC “déchets” – from assisting with the financing application to realizing the project contract) – Client : Commune de Hiva Oa – Conduct of operation Haut-Commissariat de PF – DIPAC– 2011
MASTERPLAN / MANAGEMENT PLAN
Schéma Directeur d’Assainissement des Eaux Usées de la Commune de Bora Bora – Client: Commune de BORA BORA – 2013
Wastewater masterplan updae for the commune of Faa’a – Commune de FAA’A – 2012
Stormwater masterplan development for the zone extending from the plain of Punaauia to Paea (PK 17 – 20) – Client : DEQ – Operation cost : 550 M FCP HT – 2010
Wastewater management general plan for Vaipoopoo (preliminary study)- Client : DEQ – Operation cost : 62 M FCP HTVA – 2009
Project management assistance for realizing two regulating reservoirs (50 000 m3 and 7 000 m3) in Vaiaha, Faa’a – Client : DEQ – 2008
Stormwater management masterplan for Taiarapu Est – Client: Commune de TAIARAPU-EST – 2005
Stormwater management masterplanfor Papeete – Client: Commune de PAPEETE – 2005
Wastewater management masterplan for RT2 in Mahina (PK 9 to PK 12.5) – Client: Direction de l’Equipement – 2005
Potable water supply masterplan update for the commune of Paea – Client: Commune de Paea – 2015
Potable water supply masterplan update for Taiarapu Est (project management for short-term drinking water supply works in the sectors Afaahiti to East Faaone) – Client: Commune de Taiarapu Est – 2011
Potable water supply masterplan update for the commune of Uturoa – Client: Commune d’Uturoa – 2010
Potable water supply masterplan update for the commune of Pirae – Client: Commune de Pirae – 2010
Masterplan with a timeline objective of 2020 for the production, transportation, and distribution of the island of Tahiti – Client: EDT, TEP, MARAMA NUI – 2002 – 2003
Site search for an recycling treatment center with preliminary sketch – Client : FENUA MA – Operation cost : NC – 2020
Waste and effluent management study for the class 2 abbatoir in Raiatea – Client : DIRECTION DE L’AGRICULTURE – Operation cost : Sans objet – 2020
Research and feasability study concerning the engineered landfill on the islands of Huahine, Maupiti, and Tahaa – Client : COMMUNAUTE DE COMMUNE DE HAVA’I – Operation cost : 7,8 M FCP – 2018 – 2019
Waste management study for the Abattoir de Tahiti – Client : DIRECTION DE L’AGRICULTURE – Operation cost : 4,4 M FCP – 2018 – 2019
Waste management masterplan – Client : FENUA MA – Operation cost : NC – 2019
Study concerning the dismantling of the Recycling and Transfer Center on Motu Uta – Client : FENUA MA – Operation cost : NC – 2019
Project management for the rehabilitation of the Punaruu landfill – Client : Commune de Punaauia – Operation cost : NC – 2018 – 2019
Preliminary study concerning waste collection and creation of a Category 2 and 3 engineered landfill on Raivavae (including characterization of waste products) – Client : Commune de Raivavae – Conduct of operations Haut-Commissariat de PF – DIP – Operation cost : 400 M FCP – 2017 – 2019
Complementary feasability study for the implementation of a landfill, including a green waste grinding platform on the Punaruu – Client : FENUA MA – Operation cost : 70 M FCP – 2018
Supervision of a 6 month pilot study for an evapo-concentration unit for leaching in an engineered landfill on Ua Pou- Client: Commune de Ua Pou – Conduct of operations: Haut-Commissariat de PF – DIP – Operation cost : NC – 2018
Project management for waste management on Raivavae, including a financial and legal study of SPIC, a service status assessment, and a financial impact study for department reorganiwation – Client : Commune de Raivavae – Conduct of operations: Haut-Commissariat de PF – DIP – Operation cost : 854 730 F CFP – 2017 – 2018
Assistant project management for the exploitation of Syndicat Fenua Ma installations (Paihoro engineered landfill, Motu Uta recycling and transfer center, glass collection units, and waste transfer), including establishing consulting files, offer analysis, and assistance in procurement procedures (one yaar) – Client : FENUA MA – Operation cost : 23 568 097 F CFP – 2017 – 2018
Assistant project management in contracting a project for establishing a thermic waste treatment unit in Faaroa – Client : Communauté des Communes HAVA’I – Operation cost : 2 845 000 F CFP – 2018 – present
Assistant project management for acquiring assets necessary for waste collection (trucks and bins) – Client : Communauté des Communes HAVA’I – Operation cost : 1 867 848 F CFP – 2018 – en cours
Pricing scheme study for waste management network – Client : FENUA MA – Operation cost : 1 019 856 F CFP – 2017
Waste management plan for the commune of Papara – Client : Commune de Papara – Operation cost : NC – 2017
Preliminary project for engineered landfill on Faaroa – Client : Communauté de Communes HAVA’I – Operation cost : 1 200 M CFP – 2017
Feasability study and establishment of managerial methods for the creation of a Category 2 and 3 engineered landfill on the Commune of Moorea-Maiao (Phases 3 and 4) – Client : FENUA MA – Operation cost : 1 000 M FCP – 2017
Preliminary study for renovating FENUA MA infrastructure – Client : FENUA MA – Operation cost : 270 M FCP – 2017
Waste management on the Commune of Ua Huka – Client : CODIM – 2015
Waste management on the commune of Hao – Client : Commune de Hao – 2013
Waste management for the commune of Ua Pou – Client : Commune de Ua Pou -2011
Waste management for the commune of Hiva Oa – Client : Commune de Hiva Oa -2011
Establishment of a procedure for valuation and elimination of household waste in Faa’a (Phase 1 – Evaluation of collected and treated waste) – Client : Commune de FAA’A – 2007
Establishment of a procedure for valuation and elimination of household waste in Faa’a (Phase 2 – Technical analysis of the structural specificities and site implantation) – Client : Commune de FAA’A – 2008
Underground network placement (dry and wet networks) on the island of Bora Bora (Tranche 2, Projet DCE) – Client: Etablissement des Grands Travaux – 2007
Underground network placement (dry and wet networks) on the island of Bora Bora (Tranche 1, Projet DCE) – Client: Etablissement des Grands Travaux – 2007
Feasability study on the road development for access to ‘Les Trois Cascades’ – Client: Direction de l’Equipement – Arrondissement Infrastructure – 2006
Development of the Rue Pierre LOTI tranche 1 and 2 (Projet phase / DCE, excavation, roadways, wastewater and stormwater treatment) – Direction de l’Equipement – Arrondissement Infrastructure – 2005